CSG was selected by the City to perform pavement rehabilitation design and construction inspection for a major City arterial, Millbrae Avenue, and a residential street, Magnolia Avenue. The project included pavement coring sample testing, surveying, pavement recommendations report, traffic handling plans, ADA curb ramp upgrades, traffic signal repair, and traffic detours. Stakeholder coordination was required with Caltrans Local Assistance for compliance with Federal funding guidelines (an E-76 was obtained for this project), as well as the Caltrans Encroachment Permit Department for coordination with Caltrans design review staff regarding Caltrans owned facilities.